T
gramps 600088c794 docs(tasks): six days, all remaining code — no week 2, no after-launch list
Correcting my own plan: the surge is six calendar days (Mon 2 - Sat 7), Saturday included,
and it finishes the coding side. Every open row is assigned to a day; the week-2 and
after-launch sections are gone because there are no such sections.

Days: licensing (entitlement, licence UI, greyed tiers, system messages), release blockers
(visibility picker, output contract, webcam identity, Move transitions), resilience (TASK 32,
bandwidth step-down), content and media (text layer, media wiring, profanity filter,
scheduled streams), data and settings (reward persistence, YPP slice 2, defaults split,
scene audio, settings round, disk hygiene), finish and prove (publish recording, undo, gold
pass, full sweep).

Target 6-8 units a day against a measured baseline of 3-5 — that gap is the surge. If a day
overruns, the smallest item moves; a launch blocker never does. Day 6 is the only polish day.
2026-11-01 07:35:38 -08:00

10 KiB
Raw Blame History

TASKS — the active queue

One line per live item; the detail lives in TASKS/task-*.md. Done work is in TASKS/archive.md (2026-10-29 snapshot of the old catalogue). Retired decisions are in docs/ai/decisions.md. Markers: ☐ queued · 🔶 in progress · ⏳ blocked · ⏸ deferred · ❌ retired.

The surge — six days, all remaining coding (2026-11-02 → 11-07)

Every open coding row is assigned below. No later phase, no "after launch" list. Target is 6–8 units a day (above the measured 3–5 baseline — that is the point of a surge). If a day overruns, the smallest item moves to the next day; a launch blocker never moves.

Rules, every unit, no exceptions: one Good Dog test · clean build 0 warnings · per-class tests green · ./scripts/verify.sh on the declared scope · commit with the doc fact it falsifies corrected. No new scope mid-week; anything discovered goes on a list for day 6.

Day Units Done when
1 · Mon — licensing IEntitlement seam + Steam DLC impl + fake · HasProOutput on the seam · greyed tier entries · licence UI four states + 7/1/0-day notices + "monthly is on the website, not Steam" · licence ID in About · system messages (SystemMessage/MessageCenter strip) · Debug-only InternalsVisibleTo Fake drives all four states; Steam-less launch is the free profile; About shows the licence ID
2 · Tue — release blockers Visibility picker + UpdateBroadcast · StreamConfig defaults · TASK 53 output contract (geometry test per tier, 9:16 e2e) · 9·5 webcam identity key · Move transitions (per-layer carry-across-scenes) A public broadcast starts and changes while live; every tier pinned by a test
3 · Wed — resilience TASK 32: blip retry → measured grace → amber RECONNECTING → one-click Back on air → fragmented MP4 → ingest pre-flight · 33 bandwidth step-down Killing the network mid-broadcast recovers without ending it
4 · Thu — content & media 3·17 Text layer · 21 media acquisition wiring + file picker + loop/volume UI · 49 chat profanity filter · 34 scheduled streams Text layer renders/persists; media file plays, loops, has volume; scheduled stream created
5 · Fri — data & settings 3·20 RewardEvent persistence + superChatEvents.list backfill · 39·2 YPP slice 2 · 37 defaults-vs-current split · 35 scene-linked audio · 40·A/C/D settings round · 55·2–3 disk hygiene Session report reads persisted events; defaults can be reverted; temp clips cleaned
6 · Sat — finish & prove 50 publish recording · preview undo (Ctrl+Z) · 14 creator feedback batch · 36 gold pass · full sweep: clean build, whole per-class suite, publish.sh artifact, EULA/privacy/notices in the artifact · commit + push Gold pass list empty; artifact stages; suite green; pushed

Day 6 is the only polish day. No polish passes before it — a surge dies on cosmetic passes taken in the middle.

Next up (after the surge slice)

TASK 3·17 — the Text layer is scheduled in the surge (day 4). Placeholder detail retained for the unit itself: AddSource creates it 0×0, all four compositor paths continue past it, FramePump's hash skips it, it is not draggable, and it has no text/font/colour properties or persistence. Text content, font family/size/weight/style, colour, alignment, drag/resize, persisted; renderer mirrors Services/ChatBoxRenderer.cs.

Queue

Every open coding row here is assigned to a surge day above. Rows still marked ☐ on 2026-11-07 are a failure of the plan, not a scheduling note.

Task Status Scope Detail
3·17 ☐ NEXT Text layer — content, font family/size/weight/style, colour, alignment, drag/resize, persisted task-03
21 🔶 Media source: acquisition wiring + file picker + loop/volume UI (decoder, manager, pacing, loop all shipped — no AcquireAsync caller exists) task-21
— ☐ Transitions Move: per-layer carry-across-scenes flag, per-scene placement, fixed z band ui-surface
55·2–3 ☐ Disk hygiene: delete %TEMP% alert clips on close + sweep at startup; low-disk guard before REC (slice 1 shipped) task-55
40·A/C/D ☐ App Settings: active-camera picker; persist output resolution + surface transition defaults + confirm-before-End; accent consolidation task-40
3·20 ☐ RewardEvent persistence: canonical RewardEvents table + superChatEvents.list 30-day backfill (the session report and journey read it) task-03
32 ☐ Stream resilience: blip retry → measured grace + amber "RECONNECTING" → one-click Back on air → fragmented MP4 → ingest pre-flight task-32
33 ☐ Bandwidth auto step-down: pure policy over dropped-frame rate, one-way within a broadcast task-33
34 ☐ Scheduled streams (Text-drawer version) task-34
35 ☐ Scene-linked audio task-35
37 ☐ Defaults vs current layout split (build-id); enables one-click revert to defaults task-37
— ☐ Preview undo (Ctrl+Z / Ctrl+Shift+Z) — in edit mode, revert the last preview change (drag, resize, add, remove, property edit); bounded stack, cleared on scene change or layout load. The natural partner to 37: undo covers the slip, defaults cover the mess this line
39·2 ☐ YPP slice 2: Analytics scopes, watch-hours/Shorts velocity + ETA task-39
49 ☐ Chat profanity filter: local, opt-in, non-persistent, user-supplied word list task-49
50 ☐ One-button publish of the local recording (resumable upload) task-50
53 ☐ Output-format contract: pin every tier with a geometry test, prove 9:16 end-to-end, recorded file matches output task-53
54 🔶 Freemium: EULA + privacy shipped; no licence path built — needs the entitlement seam, the output-profile cap and the licence UI below; site copy still says free forever task-54
— ☐ Steamworks entitlement — steam_api64.dll + SteamAPI.Init, BIsDlcInstalled(dlcAppId) behind IEntitlement, free profile when Steam is absent commercial
— ☐ Entitlement seam — Polar customer-portal path for the monthly (org ID public, org token never in the app), conditions: {channel_id}, 7–14 day lease, --activate CLI. No claim page, no server commercial
— 🔶 OutputProfile gate — resolver + EncoderOptions wiring done (Models/OutputProfile.cs, one ffmpeg/two outputs, dev override); remaining: greyed tier entries in the dropdown, entitlement wiring commercial
— ☐ Licence UI — four states, 7/1/0-day notices, "monthly is on the website, not Steam" line, portal link, licence ID in About commercial
— ☐ System messages — SystemMessage + MessageCenter, strip above the dock, dedupe by key, short history, never composited ui-surface
— ☐ Steam packaging — rename, publish output + steam_api64.dll, depot, steamcmd upload, store page + assets, DLC app Distribution.md
— ☐ Training-video series — capture the first 8–10 recurring questions as videos on @llamacasty; each is documentation, channel content and monetization at once MARCOM → support→content loop
9·5 ☐ Webcam identity key reconciliation task-09
14 🔶 Creator feedback batch — branch 3+ task-14
— ☐ Small: StreamConfig defaults (TargetBitrate=6000, 1920x1080) are stale — the dropdown drives StreamHealth this line
36 ☐ Gold pass — the v1 gate, always the last unit (see 1.0 gates) task-36
48 ⏸ Distribution & packaging — route settled 2026-10-31 (winget/portable first; Steam + Store parked). Build steps: Distribution.md; starts after the entitlement seam task-48
10 ❌ Retired 2026-10-08; superseded by the TASK 54 rows above — the Polar design it described is rebuilt as a lease (commercial.md), not revived as written task-10

Pending the creator's hands (not programming)

  • ✅ App Settings grouping + right-click gear — reported working 2026-10-29.
  • ✅ Transition picker/durations, Wipe, preview + program transitions — reported working 2026-10-29.
  • ✅ Brand logo layer — reported working 2026-10-29.
  • ⏳ Vertical-tier camera check (Live tile inside the band, Chat rect-only) — outstanding.
  • ⏳ Webcam cadence: a Release take in the failing geometry (vertical tier first) blocks Units 1–2. No fix until a reading names the stage.

1.0 gates (before the first shipped build)

  • Visibility picker — replace the always-Private lock, hide the TEST button, and wire UpdateBroadcast in the same unit (it is the only code that can change a broadcast's privacy).
  • Kill the dev multi-instance affordance — Helpers/InstanceProfile.cs is already #if DEBUG; re-prove it on a Release build.
  • Release engineering — scripts/publish.sh done (self-contained win-x64, ffmpeg\ guarded, no test artifacts), LlamaCasty.exe assembly rename done, full license texts beside THIRD-PARTY-NOTICES.txt (TASK 4 req 9). Outstanding: Debug-only InternalsVisibleTo.
  • Gold pass (TASK 36): the screens/layers audit, native-Windows verification, and the branding-flash decision.

Research