docs(handoff): record the ai.md split progress (3 units, not pushed)
Session summary at the top: 3 docs commits split frame-pipeline, capture, and output out of ai.md into docs/ai/*.md (verbatim moves + invariant stubs); ai.md 2,702 -> 1,289 lines. Prior 2026-10-22 state preserved below unchanged, headed as 'Prior state'.
This commit is contained in:
+23
-1
@@ -1,4 +1,26 @@
|
||||
# HANDOFF — 2026-10-22 (the creator's properties-panel asks shipped, incl. TASK 63, and pushed; the vv webcam Units 1+2 state below)
|
||||
# HANDOFF — 2026-10-26 (ai.md memory split, 3 units landed; see below — everything after this block is the prior 2026-10-22 state, still accurate)
|
||||
|
||||
## At a glance (2026-10-26 docs session)
|
||||
- **`ai.md` is being split into `docs/ai/*.md`** (user-approved: verbatim move, staged units, "ai.md
|
||||
only"). Three units landed as separate commits, **docs only, not pushed**:
|
||||
`804b1d2` (frame pipeline: cadence/timing/budget/compositor/pump),
|
||||
`096bf6d` (capture: backdrop/webcam/background effects/vertical tier),
|
||||
`a4dfca6` (output: ffmpeg/encoder/recording/audio). Each move is byte-identical in the new file;
|
||||
`ai.md` keeps a short stub with the load-bearing invariants + a link. `docs/ai/index.md` routes.
|
||||
**`ai.md` is now 1,289 lines (~32k tokens), down from 2,702 (~64k)** — more than half the
|
||||
mandatory-read cost is gone.
|
||||
- **Also landed (docs only, not pushed):** `ef60f1f` — distribution & packaging deferred until near
|
||||
v1 (creator ruling 2026-10-26); see "Next step" below for the still-open route contradiction.
|
||||
- **Remaining split candidates in `ai.md`** (not yet moved — smaller, more interleaved with law that
|
||||
should stay): Architecture's "Social bar" (46) + "Toast notifications" (24) + "Licensing — do not
|
||||
violate" (60); "YouTube Live API — design constraints" incl. "Native events & alerts" (349 total,
|
||||
99 of it alerts); "Monetization" (136); "Windows packaging & distribution" (135, frozen per the
|
||||
deferral above). None of these is urgent — pick back up only if the user asks to continue the split.
|
||||
- **Scope-check passed on all three commits**; no source touched this session.
|
||||
|
||||
---
|
||||
|
||||
## Prior state (2026-10-22) — the creator's properties-panel asks shipped, incl. TASK 63, and pushed; the vv webcam Units 1+2 state below
|
||||
|
||||
## At a glance
|
||||
- **Branch** main, tracking `origin/main`. **The six-commit properties-panel batch is PUSHED**
|
||||
|
||||
Reference in New Issue
Block a user