Files
LlamaCasty/HANDOFF.md
T

1.1 KiB

HANDOFF — 2026-11-02 (test failure follow-up)

State

  • main; local only, not pushed. Logs tabs: 9fa06c6; YPP fixture: 3985a41.
  • Stale test assumptions corrected: scoreboard pill 221b816, property hierarchy 91e308e, geometry gate 82609a5, notification theme caf91e6, dev-build gate 0e1f948, Settings gear e6a7147.
  • MicBayTests now expects the designed 0 dB maximum; focused test passes. This task is ready to commit.
  • Clean app build is 0 warnings. Full suite: 2 failed / 520 passed of 522.

Next action

Commit the MicBay assertion update, then resolve the two remaining test failures independently. Do not push absent a milestone/checkpoint request.

Landmines

  • Build/test with Windows dotnet.exe; the full suite can hang in WASAPI teardown.
  • verify.sh remains red until the 2 remaining failures are fixed; run scope-check separately when it exits early.
  • Any integration test constructing MainWindow must use a temporary LayoutPathOverride and clear it in finally.
  • Bundled FFmpeg stays outside the single-file exe (ExcludeFromSingleFile="true").