Files
LlamaCasty/HANDOFF.md
T

36 lines
1.8 KiB
Markdown

# HANDOFF — 2026-11-02 (test failure follow-up)
## State
- `main`; Logs tabs committed as `9fa06c6`, local and not pushed.
- `ChannelStatsServiceTests` uses dates relative to UTC so its 90-day upload assertion does not
expire with the calendar; fix committed as `3985a41`.
- `ScoreboardPropertiesTests` now checks for the themed `PropertyPillCheck` style instead of stale
`YtCheckBox` markup; committed as `221b816`.
- `PropertiesHierarchyTests` now checks shared styles and scopes the duplicate shape bindings to
the Shape block; committed as `91e308e`.
- `GeometryFieldWidthTests` now identifies the shared draggable-layer Geometry block; committed as
`82609a5`.
- `NotificationServiceTests` runs tint assertions with real theme resources and uses the current
`Brush.ErrorContainer` token; committed as `caf91e6`.
- `ScoreboardSimulationTests` now checks the shared `Helpers/DevBuild.cs` compile-time gate;
committed as `0e1f948`.
- `UiShellTests` now checks the orange Settings gear on the preview rail and the EDIT/session
ordering in the top bar; focused test passes. This task is ready to commit.
- Clean app build is 0 warnings. Full suite: 3 failed / 519 passed of 522; remaining failures are
being handled one task and one local commit at a time.
## Next action
Commit the UiShell assertion update, then take the next remaining failure. Do not push absent a
milestone/checkpoint request.
## Landmines
- Build/test with Windows `dotnet.exe`; the full suite can hang in WASAPI teardown.
- `verify.sh` cannot pass until the remaining 3 suite failures are resolved; scope checks are run
separately when that gate exits early.
- Any integration test constructing `MainWindow` must set `LayoutPathOverride` to a temporary DB
and clear it in `finally`.
- Bundled FFmpeg stays outside the single-file exe (`ExcludeFromSingleFile="true"`).