Files
LlamaCasty/HANDOFF.md
T

1.0 KiB

HANDOFF — 2026-11-02 (test failure follow-up)

State

  • main; Logs tabs committed as 9fa06c6, local and not pushed.
  • First test-failure task: ChannelStatsServiceTests now uses dates relative to UTC so the 90-day upload assertion does not expire with the calendar. Focused test passes.
  • Clean app build is 0 warnings. Full suite: 12 failed / 510 passed of 522; the remaining UI/content failures are being handled one task and one local commit at a time.

Next action

Commit the date-relative YPP test fix, then take the next remaining failure. Do not push absent a milestone/checkpoint request.

Landmines

  • Build/test with Windows dotnet.exe; the full suite can hang in WASAPI teardown.
  • verify.sh cannot pass until the remaining 12 suite failures are resolved; scope checks are run separately when that gate exits early.
  • Any integration test constructing MainWindow must set LayoutPathOverride to a temporary DB and clear it in finally.
  • Bundled FFmpeg stays outside the single-file exe (ExcludeFromSingleFile="true").