1.0 KiB
1.0 KiB
HANDOFF — 2026-11-02 (test failure follow-up)
State
main; Logs tabs committed as9fa06c6, local and not pushed.- First test-failure task:
ChannelStatsServiceTestsnow uses dates relative to UTC so the 90-day upload assertion does not expire with the calendar. Focused test passes. - Clean app build is 0 warnings. Full suite: 12 failed / 510 passed of 522; the remaining UI/content failures are being handled one task and one local commit at a time.
Next action
Commit the date-relative YPP test fix, then take the next remaining failure. Do not push absent a milestone/checkpoint request.
Landmines
- Build/test with Windows
dotnet.exe; the full suite can hang in WASAPI teardown. verify.shcannot pass until the remaining 12 suite failures are resolved; scope checks are run separately when that gate exits early.- Any integration test constructing
MainWindowmust setLayoutPathOverrideto a temporary DB and clear it infinally. - Bundled FFmpeg stays outside the single-file exe (
ExcludeFromSingleFile="true").