24 lines
1.0 KiB
Markdown
24 lines
1.0 KiB
Markdown
# HANDOFF — 2026-11-02 (test failure follow-up)
|
|
|
|
## State
|
|
|
|
- `main`; Logs tabs committed as `9fa06c6`, local and not pushed.
|
|
- First test-failure task: `ChannelStatsServiceTests` now uses dates relative to UTC so the 90-day
|
|
upload assertion does not expire with the calendar. Focused test passes.
|
|
- Clean app build is 0 warnings. Full suite: 12 failed / 510 passed of 522; the remaining UI/content
|
|
failures are being handled one task and one local commit at a time.
|
|
|
|
## Next action
|
|
|
|
Commit the date-relative YPP test fix, then take the next remaining failure. Do not push absent a
|
|
milestone/checkpoint request.
|
|
|
|
## Landmines
|
|
|
|
- Build/test with Windows `dotnet.exe`; the full suite can hang in WASAPI teardown.
|
|
- `verify.sh` cannot pass until the remaining 12 suite failures are resolved; scope checks are run
|
|
separately when that gate exits early.
|
|
- Any integration test constructing `MainWindow` must set `LayoutPathOverride` to a temporary DB
|
|
and clear it in `finally`.
|
|
- Bundled FFmpeg stays outside the single-file exe (`ExcludeFromSingleFile="true"`).
|